ADR-000: Performance Budgets and Quality Attributes

Accepted

Performance is a first-class requirement for this Go/Alpine SaaS starter kit. Without explicit, measurable performance budgets defined upfront, architectural decisions may inadvertently degrade user experience. Performance budgets serve as guardrails during development, ensuring that dependencies, features, and code changes align with our commitment to lightweight, fast web applications.

This ADR establishes hard performance budgets that will be enforced in CI/CD, guiding decisions about dependencies, caching strategies, and optimization priorities.

We establish the following performance budgets. Each group is classified (2026-07 amendment) by how it is actually verified today:

  • Enforced — CI fails on violation.
  • Monitored — measured by the Prometheus metrics middleware; no production baseline yet, so violations inform rather than gate.
  • Aspirational — no measurement exists; retained as design targets. Promoting one to Enforced requires building the measurement first.
  • P50 Response Time: < 50ms (median request)
  • P95 Response Time: < 100ms (95th percentile)
  • P99 Response Time: < 200ms (99th percentile)
  • Database Query Time: < 10ms (P95 for single queries)
  • Binary Size: < 20MB (compiled Go binary) — Enforced (task test:binary-size)
  • Docker Image Size: < 30MB (Alpine-based image) — Enforced (ci.yml docker job, release.yml)
  • Memory Usage (RSS): < 128MB (steady state under normal load) — Monitored
  • Memory Usage (Peak): < 256MB (under high load) — Monitored
  • Startup Time: < 500ms (application ready to serve requests) — Monitored
  • JavaScript Bundle: < 50KB gzipped — Enforced (task test:asset-budgets)
  • CSS Bundle: < 30KB gzipped — Enforced (task test:asset-budgets)
  • Total Page Weight: < 500KB (including HTML, CSS, JS, fonts) — Aspirational
  • Critical Path Resources: < 150KB (above-the-fold assets) — Aspirational
  • Largest Contentful Paint (LCP): < 2.5s
  • First Input Delay (FID): < 100ms
  • Cumulative Layout Shift (CLS): < 0.1
  • Time to First Byte (TTFB): < 200ms
  • Concurrent Connections: 10,000+ simultaneous connections
  • Requests per Second: 5,000+ RPS on single instance
  • Cold Start Time: < 100ms (relevant for serverless deployments)
  • Performance: 95+
  • Accessibility: 98+
  • Best Practices: 95+
  • SEO: 95+
  • Test Coverage: 80%+ (excluding UI templates)
  • Cyclomatic Complexity: < 10 per function
  • Maximum Function Length: 50 lines
  • Maximum File Length: 500 lines

The Enforced budgets run inside the single quality gate (ADR-021):

Terminal window
task ci # includes test:binary-size and test:asset-budgets

Amended 2026-09-09 by ADR-034 (note added 2026-09-30): the asset file lists that test:asset-budgets gates now live in internal/performance (ShippedJS, ShippedCSS) so the CI gate and the runtime observed-vs-budget grid measure the same files; the Monitored tier is measured per process and shown on the landing page. §2’s Code Quality Metrics (80% coverage, cyclomatic complexity, function and file length) belong to no tier and are not enforced — ADR-023 rejected a coverage floor; read them as Aspirational. §4’s Lighthouse CI and bundle analyzer are not wired (#136).

  • Performance tests run in CI on every pull request
  • Binary size checked and reported as comment on PR
  • Memory profiling available manually via task test:memory-profile — not wired into task ci or any workflow
  • No Lighthouse CI is wired and no staging environment exists — Lighthouse targets are aspirational (see Enforcement)
  • Hard Fail: Binary size, Docker image size, and gzipped JS/CSS asset budgets — the Enforced tier in §1. Memory usage and response times are Monitored, not gated.
  • Warning: Nice-to-have metrics (can merge with justification)
  • Review Required: Any budget increase requires explicit ADR update
  • pprof for CPU and memory profiling
  • benchstat for benchmark comparison
  • Custom middleware for response time tracking
  • Prometheus metrics for production monitoring
  • Lighthouse CI for Web Vitals
  • Bundle analyzer for JavaScript/CSS size tracking
  • Chrome DevTools for network waterfall analysis

No load-test harness is wired — vegeta, k6, and the staging environment were never built. The scalability targets in §1 stay Aspirational until one exists.

  • Quantifiable Goals: Clear, measurable targets prevent subjective “feels fast” discussions
  • Architectural Guidance: Budgets inform dependency selection (e.g., “Can we afford this library?”)
  • Regression Prevention: Automated enforcement catches performance degradation early
  • User Experience: Direct impact on user satisfaction and retention
  • Cost Efficiency: Lower resource usage translates to reduced infrastructure costs
  • Competitive Advantage: Performance is a differentiator in SaaS markets
  • Development Overhead: Requires maintaining performance test infrastructure
  • PR Friction: Budgets may slow down feature development if not balanced
  • False Positives: Synthetic benchmarks may not reflect real-world usage patterns
  • Maintenance Burden: Budgets need periodic review as application evolves
  • Over-optimization: Risk of premature optimization if budgets are too aggressive
  • Context Loss: Budgets defined without production data may be unrealistic
  • Tool Dependency: Reliance on specific tooling creates brittleness
  • Rejected: Without explicit budgets, performance degrades incrementally
  • Learning: Astro starter template demonstrated value of upfront budget definition
  • Rejected: Non-binding budgets are ignored under deadline pressure
  • Approach: Enforce in CI with ability to override via explicit ADR
  • Considered: More aggressive budgets (e.g., P95 < 50ms)
  • Decision: Balance ambition with pragmatism based on Go/Alpine capabilities

The original version of this ADR sketched a four-phase rollout (baseline load testing, budget calibration, mandatory gates, quarterly review) that was never executed; it predated the demo-first scope settled in ADR-024. The budget classification in §1 replaces it: Enforced budgets are gated by task ci today, Monitored budgets graduate to Enforced when production baselines exist to calibrate them, and Aspirational targets graduate only if their measurement (load testing, Lighthouse CI) is ever built.

Review Date: 2026-07-01

Reviewed: 2026-09-30 (docs health audit — tiers unchanged; next review 2027-03-31)

This ADR should be reviewed quarterly to ensure budgets remain aligned with:

  • Application complexity growth
  • User expectations
  • Infrastructure capabilities
  • Industry benchmarks

2026-04 Note: Budgets have not yet been validated against real production measurements. Binary size and Docker image budgets are enforced in CI. Response time and memory budgets are tracked via Prometheus metrics middleware but lack baseline data from production load.

2026-07 Note: Every budget is now explicitly classified in §1 as Enforced, Monitored, or Aspirational — the ADR previously claimed all budgets “MUST be enforced in CI” while only binary and image size were. The frontend JS/CSS budgets joined the Enforced tier: task test:asset-budgets (wired into task ci) fails if the assets shipped by the base layout exceed the budgets gzipped, using the constants in internal/performance as the single source of truth. The unexecuted phase plan in Implementation Notes was replaced with the graduation rule, and the placeholder reference URL was corrected to the real sibling repo.

2026-08 Note: The Enforcement Strategy (§3) and Load Testing tooling (§4) text was aligned with the Enforcement section below — earlier revisions claimed staging Lighthouse runs, integration-test memory profiling, vegeta/k6 load testing, and hard-fail gates on memory and response times, none of which were ever wired.


Date: 2025-11-15
Author: System Architecture Team
Reviewers: Engineering, Product

  • Testable consequences:
    • TC-1: The stripped linux production binary is under 20MB.
    • TC-2: The Docker image is under 30MB.
    • TC-3: Shipped JavaScript is under 50KB gzipped.
    • TC-4: Shipped CSS is under 30KB gzipped.
  • Checks:
    • TC-1 → task test:binary-size in task ci (status: block, pre-existing)
    • TC-2 → docker job in .github/workflows/ci.yml (status: block, pre-existing)
    • TC-3, TC-4 → task test:asset-budgets in task ci (status: block, pre-existing)
  • Not machine-checkable: Latency percentiles (P50/P95/P99), memory, and startup budgets are monitored via Prometheus but not gated — no load-test harness in CI. Page-weight, Core Web Vitals, and Lighthouse score targets are aspirational; no measurement is wired.
  • Graduation log: (empty)